A recent investigation has uncovered significant engineering flaws in the Bale Gowand Hydropower Project located in Gilgit Baltistan. The 2 MW project, completed in 2022 at a cost of 395.324 million PKR, shows critical structural issues including power channel cracks and unstable bay foundations. The report, led by Engineer Zia-ur-Rehman, recommends immediate repairs and a comprehensive review of construction processes to prevent future infrastructure failures. These findings highlight the urgent need for improved quality control in infrastructure development projects.

Key Points: PoGB Bale Gowand Hydropower Project Reveals Critical Construction Flaws

  • Major structural cracks discovered in power generation infrastructure
  • Substandard materials compromised project integrity
  • Urgent repairs recommended for project sustainability
  • Four bays built on unstable ground causing structural damage
2 min read

PoGB: Investigation reveals major flaws in Bale Gowand hydropower project

Investigative report exposes major structural issues in Gilgit's 2 MW hydropower project, highlighting critical construction and engineering defects

"Major structural failures discovered just two months after project completion - Pamir Times Investigation"

Gilgit, February 9

A recent investigation into the 2 MW Bale Gowand Hydropower Project on the Hoshe River in Pakistan-occupied Gilgit Baltistan, has revealed major issues with its construction and planning, according to a report by Pamir Times.

Initiated under the 2012 Annual Development Program (ADP) at a cost of Pakistani Rupees (PKR) 395.324 million, the project began construction in 2014 and was completed in 2022. However, just two months after completion, cracks appeared in the power channel and four bays, leading to water leakage and a drop in power generation, Pamir Times reported.

A three-member committee, formed under the chairmanship of Engineer Zia-ur-Rehman, visited the site and submitted a detailed report, as reported by Pamir Times.

The investigation revealed that the four bays, which store and direct water to the turbines, were built on soft and unstable ground. This resulted in cracks due to subsidence. Similarly, the spillway was constructed on poor-quality land, contributing to further damage, while the 4,300-foot-long power channel was found leaking water due to cracks in its walls. The report attributes these issues to the use of substandard materials, including a poor cement-water ratio, Pamir Times reported.

Additionally, the feeder channel, relocated 700 feet after the 2015 floods, faces similar instability and water pressure issues. The report suggests urgent repairs and improvements, including rebuilding the four bays on more stable terrain and relocating the spillway to a better-suited location, as reported by Pamir Times.

According to Pamir Times, the investigation also criticizes the contractors, Ahmed Ali and Sons and Ghulam Mehdi and Sons, for their subpar work. Despite the potential for increasing the project's capacity to 6 MW, the report urges authorities to focus on repairing the existing infrastructure instead of expanding power generation.

The report highlights the urgent need for corrective measures to prevent further damage and ensure the project's long-term sustainability. It also calls for a thorough review of the design and construction processes, recommending stricter quality control in future projects to avoid similar failures.