Key Points

Prime Minister Modi has approved a massive Rs 6,957 crore highway package for Assam that includes some really innovative features. The project will construct a 34.5 km elevated corridor right across Kaziranga National Park to protect wildlife while improving connectivity. This isn't just about roads - it's expected to create over 34 lakh man-days of employment opportunities for local communities. The upgraded highway will significantly reduce travel time between Guwahati and key destinations while boosting the entire northeast region's economy.

Key Points: Modi Gifts Assam Rs 6957 Crore Highway Project Near Kaziranga

  • 34.5 km elevated corridor will be built across Kaziranga National Park for wildlife protection
  • Project includes four-lane highway upgrades and two Greenfield bypasses for traffic reduction
  • Expected to generate over 34 lakh man-days of direct and indirect employment
  • Highway connects NH-127 and NH-129 to improve regional economic connectivity
  • Rs 4,829 crore allocated for construction and Rs 622 crore for land acquisition
3 min read

PM Modi's gift of Rs 6,957 crore to Assam for building highways

PM Modi approves Rs 6,957 crore for Assam highways including 34.5 km elevated corridor across Kaziranga to boost connectivity and wildlife protection

"The newly sanctioned ambitious project shall fulfil the long-cherished dream of the people of Upper and Central Assam - Assam BJP Statement"

Guwahati, October 4

While the people of Assam remain deeply grief-stricken at the untimely demise of people's artist Zubeen Garg, the Central government under the leadership of Prime Minister Narendra Modi has extended to the people of Assam a magnificent gift of Rs 6,957 crore, according to an official statement from the Assam Bharatiya Janata Party (BJP).

In a press statement, Assam State BJP said, "owing to the sustained perseverance of Assam Chief Minister Himanta Biswa Sarma and the earnest initiative of Prime Minister Modi, Assam today stands blessed to receive this grand boon, which will not only elevate the State but will also accelerate the pace of development throughout the entire North-Eastern region."

The party also highlighted this monumental approval of the Central government.

Assam state BJP Spokesperson Kamal Kumar Medhi, said that during the last 11 years, the NDA Government at the Centre has propelled Assam towards the very heart of Ashtalakshmi, towards the zenith of progress.

"The newly sanctioned ambitious project shall fulfil the long-cherished dream of the people of Upper and Central Assam, including the world heritage sanctuary of Kaziranga. As per the approval granted by the Union Cabinet, within the 85.7 km stretch of National Highway 715, an elevated corridor (flyover) of 34.5 km will be constructed across the Kaziranga National Park area", the statement read.

Along with this four-lane highway, the existing 30.22 km of roadway will be upgraded, and two Greenfield bypasses will also be built. Giving utmost priority to the protection of wildlife in Kaziranga, the Government has sanctioned construction of an 11.5 km Jakhalabandha bypass and upgradation of the Kaliabor-Numaligarh section of NH-715. In addition, to ensure the unhindered movement of wildlife between Kaziranga and the hilly terrain of Karbi Anglong, the elevated corridor of 34.5 km will be constructed with provisions conducive to wildlife crossings, it added.

The statement further mentioned that, with the construction of the elevated corridor, alongside the Jakhalabandha and Bokakhat bypasses, the problems of traffic congestion between Guwahati, Kaziranga National Park, and Numaligarh shall be greatly reduced. The length of the Bokakhat bypass will be 9.5 km, the statement mentioned.

"For this critically important highway, which holds immense significance for the economy of Assam as well as the North-Eastern region, an expenditure of Rs 6,957 crore will be incurred. The Central Government has decided that the project shall be implemented under the Engineering, Procurement, and Construction (EPC) model", the statement added.

The Assam BJP said that is estimated that the project will generate 15.42 lakh man-days of direct employment and 19.19 lakh man-days of indirect employment. As per government data, the said stretch of road presently witnesses a daily traffic flow of 13,800 small vehicles. The upgradation of the four-lane highway from Kaliabor to Jakhalabandha shall also connect with NH-127, NH-129, and State Highway 35. Out of the sanctioned Rs 6,957 crore, a sum of Rs 4,829 crore will be expended on construction, while Rs 622 crore will be allocated for land acquisition, as decided by the Central Government.

- ANI

Share this article:

Reader Comments

R
Rohit P
Great initiative but let's hope the wildlife protection measures are properly implemented. Kaziranga is our pride and we can't compromise on conservation. The employment generation numbers look promising though!
A
Arjun K
As someone from Upper Assam, this highway project is much needed. The traffic congestion near Kaziranga during tourist season is terrible. Hope this brings real development to our region. 🤞
S
Sarah B
While the infrastructure development is welcome, the timing feels insensitive given Zubeen Garg's passing. Couldn't this announcement wait a few days? The people need time to mourn their beloved artist.
V
Vikram M
₹6,957 crore is a massive investment! Hope the funds are utilized properly without corruption. The EPC model should ensure timely completion. Northeast development has been neglected for too long.
M
Michael C
The wildlife crossing provisions in the elevated corridor show thoughtful planning. India needs more infrastructure projects that balance development with environmental conservation. Good work!
K
Kavya N
Connecting NH-127, NH-129 and State Highway 35 will be a game-changer for local businesses and farmers. Better roads mean better market access. Hope the land acquisition process is fair to local communities.

We welcome thoughtful discussions from our readers. Please keep comments respectful and on-topic.

Leave a Comment

Minimum 50 characters 0/50