Key Points

The Union Cabinet has approved a landmark Rs 6,957 crore infrastructure project in Assam, focusing on highway development and wildlife conservation. The project includes a groundbreaking 34.5 km elevated corridor through Kaziranga National Park, designed to protect wildlife and improve regional connectivity. Union Minister Sarbananda Sonowal highlighted the project's potential to generate significant employment and boost economic growth. The initiative reflects Prime Minister Narendra Modi's vision for sustainable development and regional progress.

Key Points: Sonowal Reveals Modi's Rs 6,957 Cr Kaziranga Highway Project

  • 34.5 km elevated corridor to protect Kaziranga wildlife
  • Project will generate over 34 lakh person-days of employment
  • Integrates multiple highways and connectivity nodes
  • Aims to boost eco-tourism and regional development
3 min read

Cabinet nod for Rs 6,957 cr infrastructure project in Assam to boost eco-tourism, jobs: Minister

Union Minister highlights transformative infrastructure project in Assam, promising eco-tourism boost, wildlife protection, and job creation.

"A historic day for Assam and a giant leap for India's sustainable development. - Sarbananda Sonowal"

New Delhi, Oct 2

The Union Cabinet's decision approving the widening of NH-715 and developing an elevated corridor for Rs 6,957 crore in Assam will ensure safe wildlife passage and faster travel as well as boost eco-tourism and generate jobs in the state, said Union Minister of Ports, Shipping & Waterways Sarbananda Sonowal.

Sonowal hailed the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, for approving the widening and improvement of the existing highway to 4 lanes of the Kaliabor-Numaligarh section of NH-715, including wildlife-friendly measures on the Kaziranga National Park (KNP) stretch in Assam.

The project will be implemented in Engineering, Procurement and Construction (EPC) mode, with a total length of 85.675 km and a capital cost of Rs 6,957 crore. It also includes the ambitious 34km elevated corridor in Kaziranga, which will ease traffic movement and, at the same time, save the lives of animals who often fall victim to accidents.

"A historic day for Assam and a giant leap for India's sustainable development. This project reflects the vision of our visionary Prime Minister Narendra Modi ji, whose heart beats for the people of Assam and the pride of our state -- Kaziranga National Park," Sonowal said.

"The monumental 34.45 km elevated corridor will ensure a free, safe, and uninterrupted passage for wildlife between Kaziranga and Karbi Anglong Hills. It is a promise to protect our natural heritage while building a brighter future for our people," he added.

Highlighting the economic significance of the project, the Union Minister said the new corridor will improve connectivity and enable new growth in the state.

"Along with protecting Kaziranga, this highway will cut down travel time drastically, boost eco-tourism, ease travel for pilgrims and visitors, and open new opportunities for trade and industries. The 21 km of greenfield bypasses will decongest Jakhalabandha and Bokakhat, making the journey smoother and safer. This is a road that will connect emotions, aspirations, and prosperity," Sonowal said.

In addition, the project is expected to generate 15.42 lakh person-days of direct employment and 19.19 lakh person-days of indirect employment, further contributing to Assam's economic progress.

The project aims to construct a 34.5 km elevated corridor, upgrade 30.22 km of existing road, and build 21 km of greenfield bypasses. This will decongest the highway, enhance road safety, and provide seamless connectivity to key nodes in Assam.

The alignment will integrate with two major National Highways (NH-127, NH-129) and one State Highway (SH-35), while also connecting with three railway stations (Nagaon, Jakhalabandha, Vishwanath Chariali) and three airports (Tezpur, Lilabari, Jorhat). This connectivity will boost logistics, trade, and mobility across Assam.

- IANS

Share this article:

Reader Comments

R
Rohit P
₹6,957 crore is a huge investment! While I appreciate the infrastructure boost, I hope the funds are utilized properly without corruption. The employment numbers look promising - 15 lakh person-days is significant for Assam's youth. Let's ensure local contractors get priority in hiring.
A
Arjun K
As someone who frequently travels to Kaziranga, the current road conditions are terrible. The elevated corridor will be a game-changer for both tourists and wildlife. Finally, we can visit without worrying about animal accidents. Great initiative! 🙏
S
Sarah B
The environmental considerations are impressive. Building an elevated corridor to protect wildlife movement shows responsible development. This could set a precedent for other highway projects near protected areas across India. Well thought out!
V
Vikram M
Connectivity to 3 airports and railway stations will transform Northeast's logistics. This isn't just about tourism - it's about economic integration. Small businesses in Assam will benefit tremendously from better road networks. Jai Hind! 🇮🇳
M
Michael C
While the project sounds good, I'm concerned about the environmental impact during construction. 34km elevated corridor is massive - hope they conduct proper environmental assessments and involve local communities in the process. Development should not come at nature's cost.
A
Ananya R

We welcome thoughtful discussions from our readers. Please keep comments respectful and on-topic.

Leave a Comment

Minimum 50 characters 0/50