Uttarakhand: Heavy rain causes portion of newly constructed bridge to collapse
Dehradun, July 28
Continuous heavy rainfall since Monday night caused a portion of the newly constructed bridge to collapse between Prem Nagar and Nanda Ki Chowki on the Dehradun-Paonta Sahib Highway, disrupting traffic movement.
Speaking to ANI, Dehradun District Magistrate Ashish Chauhan said the road would be reopened for traffic within the next three to four hours.
"The road is being opened for traffic within the next three to four hours. The structural design of the bridge is completely safe. Appropriate further actions regarding this matter will be taken later, but our priority right now is opening the road," Chauhan said.
Meanwhile, the Char Dham Yatra has been suspended for Tuesday and Wednesday in view of passenger safety, as pilgrimage routes have been blocked at several places due to landslides and a heavy rainfall alert.
The Garhwal Divisional Commissioner said the yatra will resume once weather conditions improve and the routes are cleared and declared safe for pilgrims.
The Kedarnath Highway has been blocked in the Munkatiya area after debris and rocks fell from a hillside following continuous rainfall. Road-clearing operations are underway on a war footing, with heavy machinery being used to remove the debris. The district administration is taking all necessary measures to ensure the safe movement of pilgrims.
The Yatra Control Room is closely monitoring the entire situation in real time. Regular announcements are being made to issue necessary instructions to sector officers, police personnel, and other security forces to ensure smooth coordination and the safety of travellers.
Nandan Singh Rajwar, District Disaster Management Officer (DDMO), Rudraprayag said, "The road travel route is likely to be obstructed at many places and even now the road was blocked in Munkatiya which was opened immediately but a danger has been created there. There is a constant fear of falling rocks, due to which in view of safety, people are being made to cross the road, regarding which the concerned sector officer and rescue teams are continuously monitoring the entire route and people are also being asked to stop at safe places."
He added, "The Yatra Control Room is also continuously monitoring the weather warnings and the shopkeepers on the Kedarnath Yatra route and the pilgrims who are already present there are also being cautioned through announcements and continuous monitoring is being done from here."
— ANI
Reader Comments
Good that DM Ashish Chauhan is acting fast to reopen the road. But we need more accountability for infrastructure quality. Char Dham Yatra suspension is necessary for safety – better safe than sorry! 🙏
Every monsoon we see this – bridges collapsing, roads blocked. Is it really just rain, or poor planning? The structural design being "completely safe" sounds like standard bureaucratic line. Hope they learn from this. 🇮🇳
As someone who's been to Kedarnath, it's heartbreaking to see the yatra halted. But the authorities are right to prioritize safety. Those mountain roads are dangerous in heavy rain. Hope all pilgrims stay safe! ❤️
Yaar, Uttarakhand mein aisi incidents har saal kyun hoti hain? Heavy rain is predictable now. Bridge collapse just shows we need better construction standards and more resilient designs. At least road clearing is on war footing. Let's hope the yatra resumes soon. 🏔️
The Yatra Control Room monitoring in real time is reassuring. But constantly clearing debris from hillsides is like fighting a losing battle. We need long-term solutions – better drainage, reinforced slopes, and maybe even tunnel alternatives. Short-term fixes aren't enough. 😤
We welcome thoughtful discussions from our readers. Please keep comments respectful and on-topic.