Thu, 24 Sep 2026 · LIVE
Updated Sep 22, 2026 · 04:16
Uttar Pradesh News Updated Sep 22, 2026

UP Minister Reviews Dams, Reservoirs in Purvanchal Region

Uttar Pradesh Water Power Minister Swatantra Dev Singh reviewed dam, bund and reservoir works in Mirzapur, Sonbhadra, Chandauli and Prayagraj. Officials were directed to increase dam capacity, recharge groundwater and ensure farmers get adequate drinking and irrigation water. The meeting also stressed de-silting projects, land surveys in submergence areas and Dam Safety Act compliance.

UP Water Power Minister reviews dams and reservoirs in Purvanchal, directs farmers to ensure adequate irrigation water

Varanasi, September 22

Uttar Pradesh Water Power Minister Swatantra Dev Singh and Principal Secretary, Irrigation and Water Resources Department, Government of Uttar Pradesh, Anil Garg, on Monday reviewed works related to dams, bunds, and reservoirs located in Mirzapur, Sonbhadra, Chandauli, and Prayagraj districts.

According to a release, all Superintending Engineers, Executive Engineers, Assistant Engineers, and Junior Engineers from the Chief Engineer (Son) Organization, Varanasi, were present at the meeting.

During the review, officials were instructed to ensure necessary measures to increase dam capacity and recharge groundwater to provide farmers with adequate water for drinking and irrigation.

Projects for dams and reservoirs requiring de-silting were immediately formulated and submitted to the government. The Minister directed that the lands falling in the submergence area be surveyed and that the action of Kharij-Dakhil be ensured as per the need, and that the maintenance work of the dams be done from the DMF fund by establishing coordination with the District Magistrate in Sonbhadra district.

Special emphasis was also laid in the meeting on preparing a project for restoration of dams and ensuring safety arrangements within the prescribed limits as per the protocol of the Dam Safety Act.

Minister directed the officials that special attention should be paid to quality, safety and timeliness in the works related to dams and reservoirs and the farmers and the general public should be ensured the expected benefits of the schemes.

— ANI

Reader Voices

Leave a comment

Be kind. Add to the conversation. 0/50
Thank you — your comment has been submitted.
JS blocked