Delhi Approves ₹454 Crore Najafgarh Drain Corridor to Ease Traffic & Pollution

The Delhi government has sanctioned a ₹453.95 crore project to develop a 61-km road corridor along the Najafgarh Drain. The corridor aims to decongest major roads, reduce travel time and emissions, and improve connectivity between rural and urban areas. It will feature separate tracks for pedestrians and cyclists, along with landscaping and improved drainage. The project is scheduled to begin construction in May 2026 and be completed by November 2027.

Key Points: Delhi's ₹454 Crore Najafgarh Drain Corridor Project Approved

  • Reduce congestion on major roads
  • Cut travel time and fuel consumption
  • Provide separate tracks for walking and cycling
  • Enhance Delhi-Haryana connectivity
  • Targeted for completion by November 2027
3 min read

Delhi government approves ₹453.95 crore project to develop Najafgarh Drain Corridor

Delhi govt approves ₹453.95 crore project to build a 61-km road along Najafgarh Drain, aiming to cut travel time, reduce congestion, and improve connectivity.

"This project marks a historic step towards a sustainable, green, and well-planned transport system in Delhi. - Chief Minister Rekha Gupta"

New Delhi, February 24

The Delhi Government, led by Chief Minister Rekha Gupta on Tuesday approved a major project to develop a 61 km road along the Najafgarh Drain, aiming to improve traffic management and connectivity between rural areas and the city.

The project, approved by the Finance Expenditure Committee, involves constructing a two-lane road on the left bank from Jhatikra Bridge to Chhawla Bridge (5.94 km) and roads on both sides of the drain from Chhawla to Basaidarapur (54.83 km). The total developed length of the corridor will be 60.77 km. A total expenditure of ₹453.95 crore has been sanctioned for the project.

Speaking on the project, Chief Minister Rekha Gupta said, "The primary objectives of the project are to reduce congestion on major roads, cut travel time and fuel consumption, and lower vehicular emissions." The corridor will provide a new direction to Delhi's transport infrastructure by developing an alternative intra-city route within the capital.

The corridor will provide interconnectivity with major roads, including Outer Ring Road, Inner Ring Road, Shivaji Marg, Pankha Road, UER-II (connecting to NH-9 Rohtak Road), Najafgarh Road and other key routes. At Basaidarapur it will link with the Inner Ring Road; at Keshopur with the Outer Ring Road; at Vikaspuri with Pankha Road; at Kakrola with Najafgarh Road; and at Dhulsiras with UER-II, enabling direct access to the airport and the Dwarka Expressway.

The project will connect rural and urban areas from Dhansa to Basaidarapur, benefiting Uttam Nagar, Vikaspuri, Najafgarh, Bijwasan, Chhawla, Goyla Dairy, Dwarka, Baprola, Nilothi, Paschim Vihar, Rajouri Garden and IGI Airport, among others. It will also strengthen connectivity to Gurugram Sectors 104 and 110, further enhancing links between Delhi and Haryana.

The corridor will feature separate tracks for walking, jogging, and cycling, and a new bridge near Dwarka Metro Depot to facilitate smoother movement. Landscaping and tree plantation will be undertaken along the corridor, and street lighting, signboards, and proper drainage systems will be installed to prevent waterlogging during the monsoon.

The government aims to grant administrative approvals by March 2026, complete the tendering process by April 2026, and commence construction by May 2026. The project is targeted for completion by November 2027.

"This project marks a historic step towards a sustainable, green, and well-planned transport system in Delhi, enhancing ease of traffic movement, strengthening environmental protection, and promoting integrated urban-rural development," said Chief Minister Rekha Gupta.

Irrigation and Flood Control Minister Pravesh Sahib Singh was also present at the committee meeting. The project has received approval from the technical committee and the Flood Control Board.

- ANI

Share this article:

Reader Comments

P
Priyanka N
₹453 crore is a huge amount. While better connectivity is welcome, I hope there is strict oversight to prevent cost overruns and corruption. We've seen many projects get delayed and budgets balloon. The walking/cycling track is a nice touch though.
A
Aman W
Connecting rural areas like Chhawla and Goyla Dairy directly to the airport and Dwarka is a game-changer. It will boost local economies. My only request: please ensure proper street lights and safety, especially for the cycling track.
S
Sarah B
As someone who lives in Vikaspuri, the mention of preventing waterlogging is crucial. That area floods every monsoon. If they can actually solve that with proper drainage along with the road, it will be a double win for residents.
V
Vikram M
Good project on paper. But completion by Nov 2027? That's ambitious for Delhi. Hope they don't cut corners on the landscaping and tree plantation. We need more green lungs in the city, not just concrete.
K
Kriti O
This will make commuting from Gurugram sectors to West Delhi so much easier. Better connectivity between Delhi and Haryana is always welcome. Hope the authorities from both states coordinate well during construction.

We welcome thoughtful discussions from our readers. Please keep comments respectful and on-topic.

Leave a Comment

Minimum 50 characters 0/50