kerala-news

Kochi Petronet LNG terminal to get first load in two days

Kochi, Aug 15 : The first load of liquefied natural gas (LNG) is to be off-loaded at the brand new Rs.4,200 crore Petronet LNG Limited (PLL) terminal at Puthu Vypeen near here within two days, an official said Thursday.


Technical director of PLL Rajinder Singh told media here that the first cargo has come and is waiting in the outer sea and it would be off-loaded at the terminal very soon.

"The rough sea has delayed the ship that has come from Qatar to berth at the terminal. These are all unforeseen things," said Singh.

The ship has come with a load of one lakh cubic metres of LNG from Ras Gas in Qatar.

Petronet LNG Limited is promoted by GAIL (India) Limited, Oil and Natural Gas Corp Limited, Indian Oil Corp Limited and Bharat Petroleum Corp Limited.

The Kochi Project is a Greenfield LNG Regasification terminal with a capacity of five million metric tonnes per annum.

--IANS (Posted on 15-08-2013)

kerala-news headlines

Kerala Christians celebrate Easter Sunday

Amicus curiae report on Padmanabhaswamy temple proves me right: Achuthanandan

Suraj Venjaramoodu gets best comedian award in Kerala

4 pilgrims drown in River Periyar

IT professional held for killing his paramour's daughter

Estate manager shot dead in Uganda

Zimbabwean woman held with ephedrine

Kerala minister dismisses Left's accusations

Good Friday observed in Kerala churches

Congress heads likely to roll in Kerala

Zimbabwean woman held with ephedrine

Twins undergo first-of-its-kind surgery at AIIMS

Quick Links: Goa | Munnar | Pondicherry | Free Yearly Horoscope '2014

Comments

Your e-mail:


Your Full Name:


Type verification image:
verification image, type it in the box

Message:

Back to Top